Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 180 decisions within 5 km, 2 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
REMOVAL OF VEGETATION AND OVERBURDEN, EXTRACTION OF ROCK BY BLASTING AND ROCK BREAKING MEANS, LANDSCAPING AND RESTORATION OF SITE, ALL ASSOCIATED ANCILLARY FACILITIES/WORKS (25 YEAR PERMISSION)
McGraths Limestone Works Ltd. intend to apply for permission for development at Cregaree, Cong, Co. Mayo. The development will consist of the deepening of 19 ha. of the existing permitted quarry extraction area (Plan File Ref. No. 20/77: ABP-308748-20 & Plan File Ref. No. PL16.SU0132: QD16.QD0009) from 5 mOD to -12 mOD; Landscaping and restoration of the site; All associated ancillary facil-ities/works. The applicant is seeking a 25-year permission as part of the planning application. The planning application is accompanied by an Environmental Impact Assessment Report.
CONSTRUCTION OF A NEW SINGLE-STOREY REAR EXTENSION AT GROUND FLOOR LEVEL, NEW REAR DORMER AT FIRST FLOOR LEVEL, NEW PACKAGED WASTEWATER TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKS
The development will consist of the construction of a new site entrance, dormer bungalow, packaged wastewater treatment system, and all associated site works and landscaping.
On Grant of Outline Permission 23/60243 is sought for a dwelling house, separate domestic garage, septic tank, percolation area and all associated services
For a dwelling house, separate domestic garage, septic tank, percolation area and all associated services
The brief summarizes the pattern across all 180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2077The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.