Development consisting of (1) The demolition of an existing storage building 47 sqm in area (2) The creation of a new access road to tie in with the future eastern Garavogue bridge and approach roads scheme by Sligo County Council, associated open space and landscaping works along the river Garavogue
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Sligo Grammer School , Mall , Sligo
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 874 nearby planning records within 5 km where a location match is available.
- Matched source
- 2311
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
The retention of the dwelling house known as The Methodist Manse, as currently constructed, which has modifications to that which was initially granted permission under application number PD.1611
Development consisting of change of use of dwelling house for use for short term letting with all associated works
Construct a dwelling house, connect to existing services and carry out ancillary site works
1. To change of use from a domestic dwelling to short term tourism accommodation. 2. To construct 9 number carparking spaces to the rear of the building and all ancillary works
Development consisting of the construction of a new single-family, two-storey dwelling house with a detached shed to the rear, new vehicular entrance onto Ardaghowen Lane, together with all ancillary siteworks and services
The brief summarizes the pattern across all 874 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2311The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief