Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 177 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a slatted shed for cattle, a stables, a roofed manure pit and ancillary works (extension of existing farm road, concrete yards, effluent tank etc) in new farmyard area,using existing farm road and entrance onto public road
Construction of a calf shed and ancillary works (ie concrete yards, crush and roofed manure pit, provision of external agitation points to existing slatted tanks, minor alterations to existing silage slab and walls, all for agricultural purposes only) in existing farmyard area using existing farm site entrance
New forest road entrance together with all ancillary site services and associated site works on my lands
New forestry road and associated vehicular entrance onto R390 together with all associated site development works
Erection of 8no 12m high floodlights and 2no 18m high ball stoppers to proposed training pitch and 2no 18m high ball stoppers to existing main playing pitch
Construction of a walking track and floodlighting and all associated site works
The brief summarizes the pattern across all 177 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2336The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief