Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 911 decisions within 5 km, 3 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) Revise eastern site boundary to enlarge the site, (2) To construct a storey and a half porch to the front (north) elevation, (3) To construct a storey and a half extension to the rear (south elevation), (4) Conversion of the existing attic with gable windows and rooflights, (5) Changes to fenestration and replacement of all existing windows, (6) Install new wastewater treatment system (7) Demolish existing shed and construct a new shed to the rear of the site and, (8) carry out all ancillary site works
Development consisting of (1) Construction of a one and a half storey dwelling house (2) installation of a wastewater treatment system and percolation area (3) Construction of a new vehicular entrance and (4) Carry out of all ancillary site works.
Development consisting of the construction of a single storey domestic extension to the side of the existing domestic dwelling and all ancillary services
Development consisting of the construction of a detached dwelling house and install a waste water treatment system with associated percolation area
Development consisting of retention: (a) roof window and door to rear of conservatory, (b) porch to front of dwelling house including hipped roof over 2 bay windows, (c) stone wall along front boundary, (d) window to rear elevation, (e) revised position of windows to front elevation, together with all ancillary site works and services, previous planning reference PL04/42.
Development consisting of the following; retention of demolition of the origional cottage & construction of replacement house as constructed, on-site effluent treatment system and percolation area & connection to site services & permission to construct a single storey extension to the side (southern elevation) of existing house. Reconnection to existing site services & all associated site works
The brief summarizes the pattern across all 911 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460199The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief