Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 313 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A DISCOUNT RETAIL STORE (2264SQM GROSS FLOOR AREA OF WHICH 1472SQM IS NET RETAIL SALES AREA INCLUDING ANCILLARY OFF LICENCE AREA), CAR PARKING, SERVICE YARD, PLANT, BUILDING MOUNTED AND FREESTANDING SIGNAGE, BICYCLE PARKING, HARD AND SOFT LANDSCAPING, BOUNDARY TREATMENTS, CONNECTION TO EXISTING SERVICES A NEW ACCESS OFF CHAPEL LANE AND ALL ASSOCIATED SITE AND DEVELOPMENT WORKS
Construct twenty houses comprising eight two-bedroom, seven three-bedroom and five four-bedroom houses together with all ancillary site works and services
EXTERNAL ALTERATIONS TO EXISTING SUPERMARKET ON THE WEST ELEVATION TO INCLUDE REMOVING EXISTING FRONT ENTRANCE LOBBY AND BUILDING A NEW ENTRANCE LOBBY. EXTERNAL ALTERATIONS TO EXISTING WINDOWS, PARAPETS, WALL FINISHES. NEW SIGNAGE AND EXTERNAL LIGHTING WITH ASSOCIATED SITE WORKS AND SERVICES
Construction of first floor extensions to the two existing training centre buildings, a two-storey link extension between same, rearrangement and extension of the existing car park, together with all ancillary site works and services
CONSTRUCTION OF AN EXTENSION TO TRAINING CENTRES INCORPORATING A LINK CORRIDOR BETWEEN THE 2 NO. EXISTING TRAINING CENTRES GRANTED UNDER P16/913 ALONG WITH ALTERATIONS TO EXISTING TRAINING CENTRE, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
CONSTRUCT EXTENSION TO THE REAR OF GROUND FLOOR COMMERCIAL UNITS AND ASSOCIATED SITEWORKS AND SERVICES
The brief summarizes the pattern across all 313 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171020The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.