Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 368 decisions within 5 km, 11 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Renovate and extend existing dwelling house and all ancillary site works
The construction of a single storey extension to the rear of existing single storey house, together with internal alterations and external modifications including 2 bay windows to front of house and all associated site works
The construction of an extension to the rear of existing dwelling house (part single storey part dormer), internal modifications and external alterations to elevations, new bay window to front, domestic shed to rear together with all associated site works
Demolition of existing single storey extension to rear, chimney stacks and detached domestic sheds to rear, alterations to fenestration to front and side(south) at ground floor level, raising of roof ridge height to rear, construction of two storey extension to rear including first floor dormer extension to rear/side(north) and Velux rooflights to sides of extension, construction of new single storey domestic shed on boundary to side and rear, widening and relocation of existing vehicular entrance to rear, relocation of existing pedestrian entrance to rear and all ancillary site works
(a) partial demolition of single storey dwelling, (b) construction of a single storey extension to front, (c) construction of single storey extensions to side and rear of 2005 extension (ref. 05/1556), (d) alterations to existing window and door opes of 2005 extension (ref. 05/1556), (e) addition of 2 no. roof lights to front roof plane of 2005 extension (ref. 05/1556), and (f) all ancillary site works
(a) demolition of single storey detached dwelling, (b) construction of replacement storey and a half detached dwelling, (c) new connection to public waste water sewer, (d) alterations to existing vehicular entrance and front boundary walls and forming new pedestrian entrance to front and (e) all associated site works
The brief summarizes the pattern across all 368 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 171086The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief