Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 56 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of a dormer style dwelling house, domestic garage, entrance, effluent treatment system and polishing filter together with all ancillary site works and services
Development consisting of a single storey side and rear extension to domestic dwelling
Development consisting of the following: retention of 1) single storey extension to the northern end of the north eastern façade of the main building; 2) single storey extension to the southern end of the north eastern and south eastern façades of the main building; 3) alterations to the north eastern facade of the main building; 4) single storey extension to the north western gable of the detached two storey building to the east of the main building; 5) 3 no. detached timber storage structures to the north of the main building; 6) single storey extension within the central semi enclosed courtyard area to the south east of the main building. The development will consist of the proposed decommissioning of the existing wastewater treatment system and subsequent replacement with new wastewater treatment system, along with associated site works & services
Development consisting of the construction of a dwelling house, domestic garage, entrance by boundary wall and install an on-site wastewater treatment and disposal system
(1) alterations and refurbishments to the existing dwelling house (2) extensions to the front, side and rear of the existing dwelling house (3) demolition of existing front porch (4) a new effluent treatment system and percolation area (4) and all associated site works
Permission to construct a single storey dwelling house, Effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services at Barroe upper, Ballindoon, Co. Sligo.
The brief summarizes the pattern across all 56 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17428The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief