Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 621 decisions within 5 km, 1 exact-site or onsite candidate record, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To develop 2 no. training pitches, floodlights, spectator stand, fencing, form new roadway and access bridge from existing carpark and also alterations to site layout to include widening existing access route and all associated works
To erect temporary building for workshops and training use, located to rear of existing covered stand building and all associated site works
For the demolition of existing concrete terraces to both sides of existing covered stand building. The construction of a new 3-storey covered stand building to both sides of existing covered stand building with facilities within the stand, comprising spectator seating, new entrances, turnstiles, players and officials changing areas, concourses, circulation, toilet areas, shops/kiosk facilities, first-aid rooms, media areas, administrative offices, meeting rooms, handball court, museum area, medical area, educational area, multi-purpose room, hospitality and bar serving areas, food hall, conference area and suites, sensory room, stores, plant room and associated ancillary areas. Provision of a new entrance plaza area adjacent to car park, solar carports, signage, lighting, landscaping and all associated site works
For replacement windows to the front and rear elevations of the former kitchen block, together with all associated site works. These proposed works are in the curtilage of a Protected Structure Ref. NO 62 as part of the Cavan Town and Environs Development Plan 2017 - 2020
To erect single storey extension to side of existing dwelling, alterations to elevations & all ancillary works at Kilnavara, Co Cavan.
For new external lighting along existing avenue and student walkways, together with all associated site works. These proposed works are in the curtilage of a Protected Structure Ref. No. 62 as part of the Cavan Town & Environs Development Plan 2014-2020
The brief summarizes the pattern across all 621 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17507The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief