Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 855 decisions within 5 km, 6 exact-site or onsite candidate records, and 61 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
61 structured nearby appeal records.
61 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of 45 Sq. metre extension to the front of the existing restaurant. Alterations to existing drive thru lane to provide side by side ordering points with new order point and canopy to match existing, new drive thru menu sign to replace existing and additional drive thru menu sign and associated site works
The following development: 1. Construction of 7 no. 2 storey units with ground floor retail & first floor residential usage; 2. Construction of a 2-storey mixed retail & residential unit; 3. Connections to all mains services; 4. Entrance, Car Parking Facilities, Boundary Development, Footpaths, Site Landscaping, Signage and all additional site works
The provision of a single storey drive-thru restaurant (400sqm) including sale of hot food for consumption of hot food both on and off the premises incorporating an enclosed service yard/delivery area (94sqm) The development will also consist of: the construction of a single storey refuse store (31sqm), external seating area (120sqm), new vehicular entrance and pedestrian entrances from John Treacy Street with internal path linking Fraher Street. Surface car park for 45 no. spaces including 2 no. coach spaces, 36 no. standard parking spaces, 3 no. accessible car parking spaces and 4 no parked order spaces. Bicycle parking stands, vehicle height restrictor, 2 no. customer order points with canopies, 2 no. customer collection points, associated elevational and free standing signage, hard and soft landscaping, storm water management including culverted drainage channel and attenuation area and all associated ancillary site works
Development consisting of demolition of existing supermarket with ancillary off-licence (1,762 sqm) and construction of a new supermarket with ancillary off-licence (2,533sqm) relocated on the site adjacent to the N25 and reconfiguration of car parking to include 121no car parking spaces (replacing 125no car parking spaces) and provision of upgraded vehicular access from John Tracey Street, bicycle parking, service/delivery area, plant compound, trolley bays, totem sign and building mounted signage, hard and soft landscaping, ESB substation and PV Panels at roof level. Permission is also sought for all associated site and development works on an enlarged site of 1ha.
Extension of Duration of Planning File 18/629 for construction of a two storey office building and associated site works
Development consisting of the construction of a two storey office building and all associated site works
The brief summarizes the pattern across all 855 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17606The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief