Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 547 decisions within 5 km, 5 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to construct new 2 storey Office Building, new access from service road, connection to existing public services, car parking, signage and all associated ancillary works.
Permission to erect a new 2 story office building, new access from service road, connection to existing public services, car parking, signage and all associated ancillary works
Permission for development consisting of a new advanced technology unit comprising two storeys of office accommodation and a production space, together with associated car parking, yard, landscaping, ancillary signage and site development works.
Permission for a development consisting of the construction of a three storey office/workspace building incorporating self-contained lettable ground floor office space/workspace units, toilet accommodation, kitchenette, accessible WC/shower, storage areas, circulation area, lift, staircases and plant. First and second floor is a self contained open plan office space, cellular offices, reception/waiting area, meeting rooms, training room, toilet accommodation, kitchenettes, accessible WC/shower, storage areas, circulation area, lift and staircases. External works include car parking area, pedestrian pathways, cycle stands, electric vehicle charging point, enclosed service yard, associated landscape and connections to all existing services
Permission for a development consisting of a two storey extension to the existing M:TEK building, incorporating lettable office accommodation including co-working space. External works will include connections to existing services, alterations to existing carparking area, footpaths and associated landscaping.
Outline Permission to erect a new advanced technology building together with new access from service road, connection to existing public services, car parking, signage and all associated ancillary works
The brief summarizes the pattern across all 547 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17611The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief