Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 276 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the erection of a dwelling house and domestic garage/store with treatment system and soil polishing filter and all associated site works
For extension and first floor of existing dwelling and all associated site works at
To construct a 1 & 1/2 storey dwelling, garage, entrance, wastewater treatment system & percolation area, borehole, soakpits and all other associated site works
For the construction of a dormer style dwelling, detached garage, onsite effluent treatment system, new entrance and all associated site development works at
For a new two storey five bedroom dwelling, single storey domestic garage, waste water treatment system, new residential site entrance, new replacement agricultural access, plus all associated site works
For the following: (a) renovations and extension to dwelling house. (b) Decommissioning of existing waste treatment system and Installation of New Waste Treatment System. (c) Upgrade as required to existing entrance from public road (d) Associated works
The brief summarizes the pattern across all 276 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17635The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief