Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 48 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
RETAIN EXISTING RAFT FOUNDATION AS GRANTED UNDER P06/829. COMPLETE CONSTRUCTION OF DWELLING HOUSE, GARAGE AND SEPTIC TANK SYSTEM TO INCLUDE PROPRIETARY EFFLUENT TREATMENT SYSTEM ALONG WITH ALL ANCILLARY SITE WORKS
RENOVATION AND EXTENSION OF THE EXISTING DWELLING, INSTALLATION OF A PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS
CONSTRUCTION OF 1 NO. DOMESTIC GARAGE, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES
Planning Permission sought to erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area and all associated site works.
ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE ALONG WITH ALL ANCILLARY SITE WORKS
Demolition of part of the existing dwelling house, and the construction of a dwellilng house on the existing footprint, domestic garage, a proprietary effluent treatment system and ancillary site development works
The brief summarizes the pattern across all 48 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17716The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief