Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 135 decisions within 5 km, 4 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To Extend the Appropriate Period of Planning Permission for P17/787 to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To construct a dwelling house, garage, and proprietary waste water treatment system along with ancillary site works
To RETAIN alterations to dwelling house, garage/shed and front boundary wall/entrance
For RETENTION permission for the existing shed at "Number 27". The shed is made of galvanised steel (H-262, L-508, W-290) and will continue to be used to house a mains water softening system and for domestic storage purposes and will be screened on both North and South ends by planting.
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
The brief summarizes the pattern across all 135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17787The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief