Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,351 decisions within 5 km, 4 exact-site or onsite candidate records, and 111 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
111 structured nearby appeal records.
111 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development which will consist of the construction of a 100MW Battery Energy Storage System (BESS) with associated balance of plant, equipment and buildings including; a BESS building of 8m height, 82m length and 44m width (comprising on the ground floor a battery rack room, meeting room, Contractor/Storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, Inverter rooms; and on a mezzanine floor a HVAC/Store room); 2 no. 905m3 firewater storage tanks; an underground 830m3 surface water attenuation tank; an underground 1030m3 firewater retention tank; a 110KV electrical substation and control building of 5.2m height; an access and circulation road with new junction onto an existing IDA private road; footpath, 8 no. car parking spaces; landscaped berm wall up to 2.0m height and native tree and scrub planting, 3m paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the developments
For a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development
Of Planning Permission Reference 12/472 at
For Installation/erection of temporary office accommodation, using Portakabin Konstructa modules, on Veolia Water ireland Ltd property
For development which will consist of infrasture to manage sludge imports at the existing wastewater Treatment Plant site and comprises: New Site suface drainage and pipework and manholes; new Concrete hardstanding area; 1 No. sludge import screen and associated bunded area; 1 No. buried sludge imports receiption tank including 2 No. sludge transfer pumps; 1 no. Sludge Blending tank including 2 no. sludge transfer pumps; 1 No. Sludge Belt Press for sludge dewatering including polyelectrolyte dosing pumps to be housed within existing dewatering building; 1 No. Sludge liquor Return Balancing tank including 2 No. Liquor transfer pumps; Odour control plant for sludge imports; Works also include refurbishment of some existing mechanical and /or electrical components to existing equipment with the existing WWTP. A Natura Impact Statement has been prepared for this proposed development and is being submitted to the planning authority with this applicaiton
For the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works
The brief summarizes the pattern across all 1,351 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17818The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief