Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 462 decisions within 5 km, 5 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for construction of a new story and a half style dwelling house, using existing agricultural entrance onto public road. Install new waste water treatment plant and percolation area (demolish existing septic tank & percolation area and relocate to adjoining site under separate planning application) all site works and ancillary works in accordance with the plans and information. **SIGNIFICANT FURTHER INFORMATION RECEIVED 22/3/2018 to allow for the retention and completion of domestic garage, realign site entrance to share existing site entrance to adjacent dwelling, minor alterations to dwelling design and all ancillary site works**
EXTENSION OF DURATION OF 17/856: Permission for construction of a new story and a half style dwelling house, using existing agricultural entrance onto public road. Install new waste water treatment plant and percolation area (demolish existing septic tank & percolation area and relocate to adjoining site under separate planning application) all site works and ancillary works in accordance with the plans and information. **SIGNIFICANT FURTHER INFORMATION RECEIVED 22/3/2018 to allow for the retention and completion of domestic garage, realign site entrance to share existing site entrance to adjacent dwelling, minor alterations to dwelling design and all ancillary site works**
Permission to decommission/demolish existing septic tank and relocate/install new waste water treatment plant and percolation area, relocation of site boundary, all site works and ancillary works in accordance with the attached plans and information.
Permission for a dwelling house, domestic garage, waste water treatment system and associated site development works
Permission for a dwelling house, domestic garage, waste water treatment system and associated site development works
Permission for a dwelling house, waste water treatment system and associated site development works
The brief summarizes the pattern across all 462 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17856The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief