Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 693 decisions within 5 km, 1 exact-site or onsite candidate record, and 47 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
47 structured nearby appeal records.
47 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(A) Construction of an Agricultural building to include cubicle housing, straw bedding area and underground slatted tanks. (B) Construction of an Agricultural building to include a milking parlour, dairy & ancillary rooms, general store, livestock waiting yard, handling facilities and underground soiled water tanks (C) Construction of an Agricultural building for calf rearing purposes (D) Construction of a machinery storage shed and straw bedding livestock isolation pens. (E) Construction of 2 no. Silage pits, Maize pit and Dungstead. (F) Construction of an Overground Slurry Store. (G) Erection of a Meal Bin, Water Storage Tank and External Milk Silo. (H) Construction of 2 no. Agricultural Underpasses and pre-cast soiled water tanks. (I) Widening of existing agricultural entrance and all associated site works
(1) the construction of a new storey and a half type extension to the original house (2) a front porch, (3) an additional window ope to the rear of the original house, (4) a garage and (5) new blockwork boundary walls. PLANNING PERMISSION is sought for an upgraded waste water treatment system and polishing filter along with all associated site works
Outline permission is sought to construct Single-Storey Dwelling, Garage, wastewater treatment system, Entrance and Ancillary works
PERMISSION CONSEQUENT on the grant of outline permission (outline permission planning file reference 20/690 refers) is sought to construct Single-Storey Dwelling, Garage, Wastewater treatment system, Entrance & Ancillary Works
To construct a single-storey extension to the existing school to include, 1 No. classroom, resource room, w/c and the demolition of 1 No. Shed and 1 No. Existing Prefab, together with all associated site development works
An all-weather playing pitch together with perimeter fencing.
The brief summarizes the pattern across all 693 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17871The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief