Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 403 decisions within 5 km, 3 exact-site or onsite candidate records, and 28 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
28 structured nearby appeal records.
28 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Solar PV panel array comprising photovoltaic panels on ground mounted frames within a site area of 21.04 ha, 8 no single storey MV substations, 1 no single storey DSO substation, 1 no single storey customer substation with 1 no communications pole attached, 1 no single storey spares building, boundary securing fencing and access gates, CCTV, associated electrical cabling and ducting, upgraded and new access tracks and all associated ancillary development and landscaping works. The planning application includes a Natura Impact Statement
Permission for a period of 10 years to construct and complete a solar PV energy development and grid route, with a total site area of 28 hectares comprising of the construction of PV panels mounted on metal frames, transformer stations, new access tracks, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, 20 kV underground cabling connecting the solar farm to the existing Blessington 38kV ESB Substation, and all ancillary grid infrastructure and associated works. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of the application for planning permission
Of PRR 17/908 and PRR 21/1237
Amend the design of the approved development (Planning Reference 17/908) which comprises consent for a Solar PV Energy Development. Proposed amendments include (1) Project lifetime proposed to be extended from 30 years to 35 years (2) Substation to increase in size (3)Change in height and angle of solar panels (4) Transformer containers to increase in size (5) Removal of the customer substation (6) Deer fencing to increase in size (7) MW output to be increased from 10.8 to 15MW to align with existing grid connection offer (8) Slight alteration to the access tracks and (9) Number of CCTV cameras to reduce
Construction of two storey dwelling with a treatment plant, soil polishing filter and a new entrance along with all associated site works
Two storey dwelling with garage, oakstown treatment plant with soil polishing filter and widening of existing access laneway and all associated site work
The brief summarizes the pattern across all 403 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17908The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief