Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 299 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A loose agricultural shed and all associated site works
(1) Retention of existing agricultural entrance, piers wing walls and gravel driveways and parking area. (2) Retention of existing agricultural shed, including slated unit and underground slurry storage tank. (3) Retention of existing storage container, staff canteen. (4) Retention of steel containers for use as tack room and feed-stuff storage and all associated site works
The erection of family dwelling, bored well, waste water treatment system. Permission to change the use of existing agricultural entrance to residential with the construction of new entrance/wing walls and front boundary fence and all associated site works
The erection of a dormer dwelling and all associated site works including connection to existing public sewer and retention permission for existing entrance
Demolish existing concrete block wall and construct a heritage project consisting of paved area with blacksmith memorial and fountain and all associated site works
The erection of solar PV panels on the roof of existing building including all ancillary site works
The brief summarizes the pattern across all 299 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief