Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 876 decisions within 5 km, 6 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Carlow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Carlow County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Carlow County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedNo current-dated citation is loaded for Carlow County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Full planning permission is sought to demolish existing single storey garage, full planning permission is sought to construct 8 no. terraced two-storey townhouses with new site entrance, and all associated site works and services.
Retention permission for as built boundary wall and all associated site works
To construct two no. two storey dwelling houses, associated car parking and vehicular entrances, new site boundaries, general landscaping, connection to existing mains water and sewage and all associated site works
Retain (a) change of use from previous domestic garage to an existing bedroom to side of existing two storey dwelling, (b) retain an existing sunroom to the rear of existing two storey dwelling and all ancillary site works. (c) PERMISSION to construct extension to the side of existing two storey dwelling at firest floor level, exterior and interior alterations and all ancillary site works
Construction of an ESB Medium Voltage substation (standard design) to include an adjacent customer switchroom and transformer on a concrete foundation and base, and all associated ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
Permission to construct 18 new houses and all associated site works
The brief summarizes the pattern across all 876 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18104The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief