Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 1,931 decisions within 5 km, 4 exact-site or onsite candidate records, and 431 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
431 structured nearby appeal records.
431 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
4 no 10 meter high lighting poles with flood lighting, erection of 2 no 10 metre high by 20m long ball stop netting barriers, associated site works including excavation
Section 42 on PRR 18/1114 ( (i) the erection of 4 No 10 meter high lighting poles with flood lighting, (ii) the erection of 2 No 10 meter high by 20m long ball stop netting barriers, (iii) associated site works including excavation
5m high ball stop netting barrier to the north east side of the playing pitch, associated site works including excavation
Revisions to a permitted residential (ref 16/253). The development will consist of the relocation of the ESB substation, the repositioning of two units on site (house type A and A1) including reconfiguration of associated gardens and car parking, boundary treatments, landscaping, and all associated site and engineering works necessary to facilitate the development. Carrigbrae House is a protected structure
Construction of a single storey stand-alone building consisting of two classrooms, one general activities room, one multi-sensory room, one office, associated ancillary spaces together with all associated works
Attic conversion, inclusive of 5 no. roof lights and the creation of habitable space with the attic space
The brief summarizes the pattern across all 1,931 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181114The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief