Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 128 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
INSTALL NEW DIVING BOARDS, ON A SITE AT FENIT BATHING SLIPS, FENIT WITHOUT, FENIT, CO. KERRY.THE DEVELOPMENT WILL COMPRISE OF THE MODIFICATION OF EXISTING CONCRETE STRUCTURES, CONSTRUCTION OF NEW DIVING BOARDS, ACCESS PLATFORMS, RAILINGS AND ASSOCIATED SERVICES
(A) TO DEMOLISH EXISTING SINGLE STOREY SHED, (B) TO ERECT A SINGLE STOREY BOATHOUSE (C) FOR ELEVATIONAL CHANGES TO EXISTING DWELLING (NEW WINDOW CONFIGURATION TO LOUNGE), (D) ALL ANCILLARY SITE WORKS
(A) DEMOLISH RUINS OF EXISTING COTTAGE AND (B) BUILD A NEW CAFE AND APARTMENT, COMPLETE WITH PAVEMENTS AND ALL ASSOCIATED WORKS AND SERVICES
The development consists of the renovation and alteration of an existing dwelling including the replacement of the existing roof structure with a new dormer roof construction, alterations of existing elevations, internal modifications, construction of a garage and ancillary site works
ALTERATION AND EXTENSION WORKS AND PART CHANGE OF USE TO THEIR COMBINED RESIDENTIAL AND SHOP/CAFÉ BUILDING COMPRISING THE FOLLOWING: 1. REMOVAL OF THE RESIDENTIAL FRONT ENTRANCE PORCH AND REMOVAL OF A REAR SINGLE STOREY (RESIDENTIAL) STRUCTURE. 2. TO CONSTRUCT A FRONT ENTRANCE CANOPY. 3. TO CONSTRUCT A (RESIDENTIAL) TWO STOREY REAR EXTENSION. 4. FOR CHANGE OF USE OF PART OF THE RESIDENTIAL GROUND FLOOR TO SHOP/CAFÉ USE. 5. TO INSTALL VELUX ROOFLIGHTS ADN SOLAR PANELS. 6. TO CARRY OUT INTERNAL LAYOUT AMENDMENTS. 7. TO CARRY OUT ALL ASSOCIATED EXTERNAL WORKS, SIGNAGE AND ELEVATIONAL CHANGES
INSTALLATION OF A PASSENGER LIFT TO REAR OF BUILDING AND CHANGE OF USE OF FIRST FLOOR FROM STORAGE TO AN EDUCATIONAL FACILITY
The brief summarizes the pattern across all 128 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181176The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief