Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 362 decisions within 5 km, 1 exact-site or onsite candidate record, and 41 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
41 structured nearby appeal records.
41 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) RETENTION PERMISSION OF AN EXISTING GUEST HOUSE CONSISTING OF 2 PRIVATE AND 7 GUEST EN-SUITE BEDROOMS AND ASSOCIATED ANCILLARY AREAS AND ALSO TO INCLUDE AN EXISTING GARAGE/STORAGE SHED SERVING IT ALL AS CONSTRUCED & (B) PLANNING PERMISSION TO (1) THE CONSTRUCTION OF A SINGLE STOREY/STOREY AND A HALF SIDE EXTENSION FOR PRIVATE DOMESTIC USE TO AN EXISTING GUEST HOUSE ENCOMPASSING AN EXISTING GARAGE/STORAGE SHED (2) MAKE INTERNAL FLOOR PLAN ALTERATIONS AT GROUND FLOOR LEVEL TO THE EXISTING GUEST HOUSE (3) DECOMMISSION AND REMOVE AN EXISTING SEPTIC TANK AND SOAK PIT ON SITE AND IN ITS PLACE INSTALL A NEW WASTEWATER TREATMENT UNIT AND PUMPING STATION DISCHARGING TO PURAFLO PEAT BIO-FILTERS AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
Permission to a) Extend and renovate the existing dwelling, to include a first floor element of accommodation b) Decommission the existing waste water treatment plant and associated works c) Install a mechanical treatment plant and raised polishing filter. d) construct all associated site works
Retention permission to: Retain the roadside security fencing & gates, the additional external doors and the internal mezzanine floor as they are constructed & to retain the two porta cabins on site on a temporary basis AND Permission to: Construct (A) an extension to the southwestern side of the building and all necessary alterations to the existing building including relocating the toilet into the proposed extension, painting the existing external windows, doors and roller doors in grey. (B) an advertising sign on the main building. (C) a plinth sign inside the existing stone wall at the side of the public road (D) Landscaping at public roadside and including all associated site works
TO REMOVE EXISTING STREET LIGHTING TO EXISTING SERVICE ROAD
Permission for development to renovate their dwelling house. The proposed works will include: (A) Altering the internal layout. (B) Demolishing the existing Utility and constructing a new structure in its place. (C) Adding a new patio door opening to the rear of the house. (D) Refurbishment of existing roof, walls, services etc. including new style windows & doors. (E) All necessary site works
(A) DEMOLISH AN EXISTING 2 STOREY DWELLING HOUSE AND (B) CONSTRUCT A NEW 2 STOREY DWELLING HOUSE SERVED BY A WASTEWATER TREATMENT UNIT DISCHARGING TO A SOIL POLISHING FILTER, ALL ASSOICATE SITE WORKS
The brief summarizes the pattern across all 362 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181226The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief