Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

National Technology Park , Plassey , Limerick.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

National Technology Park , Plassey , Limerick.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The site check found 1,150 decisions within 5 km, 2 exact-site or onsite candidate records, and 98 structured appeals.

Matched source
181263
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

98 structured nearby appeal records.

98 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

1,150Nearby applications
2Site-linked candidates
11%Nearby refused
98Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

181263

(a) an extension to the main building comprising the construction of an extended production hall with mezzanine plant space overhead, a predominantly 2 storey (part 3 storey) production support/utility block, expansion of the existing control room, a single storey loading bay, and roof access stairwell, all on the south side of the existing building (5,005 sqm); (b) the construction of a new plant and equipment to the rear of the building, including storage tanks, bunds, piperacks, a 15m high stack, and 2 new truck loading bays, (c) the relocation of an existing chemical storage shed (35 sqm), (d) the construction of an additional water retention pond along the southern boundary, and associated site works. A Natura Impact Statement has been prepared in respect of this planning application

Granted0.0 km08 May 2019
22462

Amendments to previously approved (Plan red 18/1263) development of an extension to the existing Manufacturing Building, with associated plant, equipment and ancillary works. The amendments will comprise: (a) an increase in area from 5,005 sqm to 6,599 sqm of the approved extension to the main building comprising the construction of an extended production hall with mezzanine plant space overhead, and amendment to the approved predominantly 2 story (part 3 story) production support areas and utility block. (B) Increase in roof height of the extended production hall. The apex will increase form approved 22.30m OD to 23.85m OD. The western parapet will remain at the previously approved height (22.75m OD) to match the western parapet of the existing building. The southeastern and eastern parapets will step up from the approved 22.30m OD to 24.38m OD. Guardrails are proposed to provide edge safety protection to the roof areas where necessary. (C) Increase from one to two loading bays on the southeast elevation of the extension. (D) Addition of a single storey electrical room (15 sqm), and a two-storey electrical/control room (140 sqm) to the rear of the building. (E) Amendments to the approved layout of the new plant and equipment to the rear of the building, including the installation of additional tanks varying from circa 5.5m to circa 12.0m high, bunds, pipe racks, a new solvent recovery system with 2 no. columns circa 16m high, an additional15.0m high stack in a reconfigured abatement system. (F) 2 no. new cooling towers circa. 11.42m high in the existing utilities yard. (G) Omission of the previously approved additional solvent tanker loading bay in the utilities yard. (H) Relocation of the existing hydrogen peroxide unloading areas. (I) A new pipe rack across the existing services yard. (J) Amendment to size and location of the previously approved additional water retention pond along the southern boundary and associated site works. A Natura Impact Statement has been prepared in respect of this planning application

Granted0.0 km05 September 2022
22558

A water retention pond, area circa 1,100m2 with 2.0m high perimeter fence, relocation and modification of existing landscaped berm, and associated ancillary works

Granted0.1 km16 September 2022
221053

The erection of a fence & gate to the boundary with UL Bohemian RFC, installation of a gate in the existing fence, and all ancillary site works

Granted0.2 km22 November 2022
2460298

The development that comprises: (a) the retention of modifications to previously approved permission Planning Ref. No. 15/180 to omit the 3-storey office building and canteen to the front (south-west) of the main facility; and (b) the retention of 2 no. groups of temporary cabin structures to the front (south-west) of the main facility, and associated site works

Granted0.2 km30 May 2024
23461

Improvements to existing dwelling, elevational alterations to the front(east) facade of the existing dwelling, construction of a two-storey dormer style extension to the existing dwelling, new vehicular entrance and ancillary site works

Granted0.3 km10 January 2024

The brief summarizes the pattern across all 1,150 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required