Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 2,113 decisions within 5 km, 10 exact-site or onsite candidate records, and 275 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched275 structured nearby appeal records.
275 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of existing forecourt, construction of retaining wall and fencing to eastern boundary and all associated site development works
(i) a 52.2sqm extension to the eastern side of the existing service station retail building (bringing the total floor area to 235.1sqm ) (ii) internal modifications and additions including an area for the sale of alcohol for consumption off the premises (i.e. off-licence use) of 16sqm, which is ancillary to the primary retail use and results in an increase in net retail floor area of 20.7sqm ( to bring it to a total of 100sqm), revisions to deli and till areas and new staff facilities and customer toilets (iii) the extension of forecourt fuel area incorporating an extended forecourt canopy and 1no. additional pump island (iv) revised parking arrangements resulting in the provision of 17no. car parking spaces (v) the relocation of service areas and vent stacks and all associated drainage and site development works
Installation of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 no. internally illuminated advertising panels each of 2.0 square metre area on the public footpath
(i) installation of storage container (13.98sqm.) on western side of retail amenity building, (ii) a lean to roof with timber structure adjoining to the rear of existing retail building, (iii) new 2100mm high fence and secure gate and (iv) all other associated site development works
Extension of appropriate period of PRR 17/852 (bottle store, extended kitchen, bar areas, toilets, seating area, stones, new function space with ancillary storage and service yard, extension of existing fire escape platform at first floor and new fire escape stairs from first floor to ground floors. Along with revised parking and all associated site development works to include revised drainage)
Demolition of existing outbuilding and the erection of a three storey detached building to side of present pub with 4 no units at ground level with retail / restaurant use, with 2 no office suites at first floor, with 4 no apartments (2 no 2 bed duplex's and 2 no 1 beds) at first and second floor levels with balconies and on each and west elevations. The construction of a two storey restaurant building and the reconfiguration of the existing carparking layout and associated site works
The brief summarizes the pattern across all 2,113 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181285The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief