Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 184 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
An application area of 14.8 hectares. Extraction of sand and gravel (dry working) over an area of 11.5 hectares with processing that includes crushing, washing (closed water recycling system with associated silt storage lagoon) and screening and all ancillary works and structures, site facilities consisting of prefabricated office, canteen facility, WC, septic tank and percolation area, bunded and covered fuel tanks, hydrocarbon interceptor, weighbridge and office, aggregate quality testing lab, wheelwash and perimeter screening berms and fencing, access to the site will be via a new splayed entrance priority junction onto the R747 regional road with relocation of the existing percolation area granted under Planning Ref 14/1370, progressive restoration of the site to an agricultural after use, the proposed extraction operational period is for 13 years plus 2 year to complete restoration (total duration sought 15 years). An EIAR has been prepared in respect of the application
(a) Bungalow, upgrade existing entrance to shared double entrance, new treatment system and percolation area and all associated site development works
A single storey dwelling, a garden shed, a wastewater treatment system, new entrance and all ancillary works
Bungalow, effluent treatment system and ancillary works
Bungalow with a storey and half dormer element, inclusive of 3 no rooflights to front, 2 no dormer windows to front, 1 no dormer window to rear, a separate garage, a new vehicular entrance, a new well, a wastewater treatment system and polishing filter and all associated ancillary site development works
Bungalow, effluent treatment system and ancillary works
The brief summarizes the pattern across all 184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181288The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief