Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 135 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Demolish existing detached garage and construct two-storey dormer extension to side of existing cottage with glazed link, widen and construct new entrance walls and piers, effluent treatment system and percolation and associated development works
A) existing dwelling house to be retained and refurbished with internal changes and partial demolition and extension b) demolition of 40.21 m2 derelict outbuilding c) 174.44 m2 of ground floor extension to the south-east elevation of the existing dwelling house. d) construction of pier gate entrance at the existing entrance to the site, e) adopting the existing vehicular access driveway to serve the house site, f) to upgrade the existing wastewater treatment system to current EPA Code of Practice with new proprietary septic tank and percolation area with polishing filter g) and all associated site works.
Construction of a bungalow type dwelling house, detached garage, entrance, boundary fence/wall. Suitable sewerage system with polishing filter and all ancillary works
To retain the following alterations to existing dwelling house: (a) minor revisions to previously permitted extensions to both sides of the dwelling including a reduction in size of permitted garage on one side and an increase in size of the extension on the other side together with associated revisions to external windows and doors including closing up door on front elevation; (b) the construction of a new pitched A roof on the dwelling to incorporate permitted flat roof extensions; (c) the conversion of the attic space and provision of two gable windows; (d) the construction of detached garage in the rear garden; (e) revisions to rear and side site boundary including retaining front boundary wall and additional vehicular access
Change of use from 2 No. Holiday Apartments to 1 No. Domestic dwelling
Construct a new domestic garage / fuel shed to serve existing dwelling house and all associated site development works
The brief summarizes the pattern across all 135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18160The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief