Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,121 decisions within 5 km, 4 exact-site or onsite candidate records, and 221 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
221 structured nearby appeal records.
221 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which will consist of alterations, façade enhancement and provision of new entrance lobbies to the former Hewlett Packard facility, Ballybrit, Galway including the provision of 74 no. additional carparking spaces and ancillary site works
Permission for the development which will consists of the subdivision of the existing building and change of use of unoccupied area from industrial to specialist office use, façade enhancements and alterations, provision of new entrance lobbies and 74 no. additional carparking spaces and ancillary siteworks
Permission for development which consists of (i) the change of use from industrial to office use of 858sqm within the existing building 2 (identified as MOD 2) on the site; (ii) provision of roof mouthed plant, stacks, perimeter handrail, and roof lights on MOD 2 (iii) alterations to the east and west facades of MOD 2 (iv) the construction of an external 2 storey central utility building (CUB) with a floor area of 1000sqm and an external fenced utility yard; the associated proposed works include; demolition of no. 3 external existing redundant utility buildings; alterations to existing internal roads and pedestrian footpaths; site lighting; installation of an overhead pipe rack between MOD 2 and the proposed (CUB); the provision of underground services and surface water management infrastructure; landscaping and associated site works
Permission for development which will consist of modifications to a previously granted scheme (Planning Ref. No. 20/241) to include a new roof plant platform with screen and stepped access on Building 2 MOD 3
Permission for the development which will consist of works to Building 2 MOD 3 comprising alterations to the previously granted permission (Ref. No. 19/309). The alterations will include an increase in the new floor area to 668m2 at first floor level, to be used as lab/office space with 2 no. access stairs and a lift, all within the existing building, alterations to part of the south & west facades with entrance landscaping along the west façade and the inclusion of roof lights in the existing roof. Proposed works will also include additional shower and janitor facilities within Building 2 MOD 1 at ground floor level
Permission for erection of 1 No. externally illuminated freestanding sign, 8 No. non-illuminated parking signs and 1 No. internally illuminated wall sign
The brief summarizes the pattern across all 2,121 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief