Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 98 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
CONSTRUCTION OF A NEW DWELLING HOUSE, FORM ENTRANCE, INSTALL SEPTIC TANK WITH PERCOLATION AREA & ASSOCIATED SITE WORKS
A new dwelling house, domestic garage, wastewater treatment system, driveway, entrance and all associated site works.
A slatted livestock cubicle shed with underground slurry storage, milking parlour including ancillary areas and all associated site works.
A new dwelling house, domestic garage, wastewater treatment system, driveway, entrance and all associated site works
CONSTRUCTION OF AN EXTENSION TO AN EXISTING LIVESTOCK HOUSING UNIT, INSTALL AN UNDERGROUND SLATTED SLURRY HOLDING TANK, CONSTRUCTION OF A SEPARATE EXTENSION TO EXISTING MILKING PARLOR AND EXTEND EXISTING SILAGE SLAB WITH ALL ASSOCIATED SITE WORKS
THE CONSTRUCTION OF AGRICULTURAL CUBICLE SHED AND STRAW BEDDED SHED WITH UNDERGROUND SLATTED TANK ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 98 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18349The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief