Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 146 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To extend existing car park to facilitate existing retail store, all as per drawing documentation submitted together with all ancillary site works and services at
Permission for development which will consist of a new dwelling, gated entrance, 2 no. garages and suitable wastewater treatment system with polishing filter and all ancillary site works at
Permission to construct dwelling house and domestic garage along with associated siteworks and services at
Permission for a ten year planning permission is being sought for the proposed development which will consist of the following elements: the installation and operation of 1 no. battery energy storage system compound containing battery energy storage containers, 1 no. electrical substation and compound, connected to the national grid system via c. 50m of underground cable to the ESB Castlerea 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 0.644 hectares at
Permission to refurbish and extend to side of existing dormer type dwelling, associated site works and services at
Permission for the following: (1) Demolition of existing storage shed and part of existing dwelling; (2) Construction of new single storey extensions to the side and rear of existing dwelling; (3) Changes to window fenestrations to roadside elevation and (4) Alterations to roadside entrance, together with all associated site works (Application made for Permission for the following: (1) Demolition of existing storage shed and part of existing dwelling; (2) Construction of new single storey extensions to the side and rear of existing dwelling; (3) Changes to window fenestrations to roadside elevation; (4) Construction of a new domestic storage shed and (5) Alterations to roadside entrance, together with all associated site works) at
The brief summarizes the pattern across all 146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18518The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief