Executive snapshot
11% of nearby decided applications were refused. The site check found 318 decisions within 5 km, 4 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for: • Amendments to that previously Granted Planning Permission (Ref: 2560064) • Proposed extension to the North and South of the loading bay area attached to Warehouses No. 7 & 8. • Provision of additional roller shutter door to the Western elevation of Warehouse No.8. • Together with all associated minor elevational changes and associated site works
Permission for development consisting of the installation of 1) 1,063m2 of PV (Photovoltaic) solar panels with anti-reflection coating to the southern portion of the existing pitched roof to warehouse no. 5. 2) 3,386m2 of PV (Photovoltaic) Solar Panels with anti reflection coating to both pitches of the existing pitched roof of warehouses No. 6 & 7 together with all associated site works.
The construction of (i) the demolition of an existing disused single storey flat roofed office building (ii) the erection of a 2.4m high boundary wall, adjacent to the demolished offices, (iii) the erection of a 9m high sprinkler fire water storage tank, with associated containerized sprinkler pump house and standby generator, (iv) proposed platform to South-West of existing warehouse, to support mechanical and electrical equipment, (v) the construction of 2 no. ESB substation with attached MV & LV switch rooms and transformer compounds to service the existing site, (vi) minor amendments to layout of existing boundary wall, (vii) together with all associated site works. Significant further information relates to condensers to be relocated inside the building, reduction in height of proposed sprinkler fire water storage tank from 9m to 6m and the submission of a noise impact assessment.
Permission for: • Proposed Warehouse Building • Extension and increase in height of loading bays / marshalling area to the West of existing Warehouse No. 7, with associated minor elevation changes including high level windows to North and South elevations. • Together with all associated site works
Permission for a one and a half storey type dwelling house, a waste water treatment system, a new site entrance with all associated site works. Significant further information relates to amended site boundaries.
Permission for a 2-storey dwelling house, a waste water treatment system, a new site entrance and all associated site works. Significant further information relates to alterations to the house design along with the re-positioning of the proposed dwelling site.
The brief summarizes the pattern across all 318 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18563The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief