Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 339 decisions within 5 km, 3 exact-site or onsite candidate records, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an earthen bank safety bund to protect waters and Retention Permission is sought for as constructed overground slurry storage tower
The construction of an earthen bank safety bund to protect waters. Retention Permission is also sought for as constructed overground slurry storage tower
A slatted shed for cows with underground slurry storage, cubicles and feeding passage, a dairy washings storage tank
The subdivision of portion of existing dwellinghouse to form a new two-storey mid-terraced dwellinghouse, the insertion of velux rooflights on rear elevation, new chimney, connection to the existing wastewater treatment system and associated site works. This property is a protected structure
(1) the change of use from garage/store (granted under planning ref. 99/279) to bedroom and bathroom to include the construction of a link to the existing dwelling house (2) changes to the dwelling house to include the provision of a balcony to the side elevation, provision of a two storey extension to the rear, the provision of 2 no. velux roof lights to the front and to change from velux roof lights to dormers on the rear elevation (3) retention of the storage shed on site
The construction of a single storey independent living unit attached to existing dwelling with associated site works
The brief summarizes the pattern across all 339 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18577The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief