Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 43 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
TO CONSTRUCT AN OFFICE BUILDING AND A BOAT STORAGE FACILITY CONNECTING TO AN EXISTING EFFLUENT TREATMENT SYSTEM. TO CONNECT THE SEWERAGE FROM THE EXISTING HOLIDAY ACCOMMODATION TO THE EXISTING EFFLUENT TREATMENT SYSTEM SERVING AASLEAGH LODGE
INSTALL 3 NO. ANTENNAS AND 2 NO. DISHES AND FRAME SUPPORT TO THE EXISTING PERMITTED ANTENNA SUPPORT STRUCTURE. P09/1171 REFERS. IN ORDER TO FACILITATE THE DECOUPLING OF THE IN-SITU H3GI SHARED ANTENNAS ON BEHALF OF EIR MOBILE, TOGETHER WITH ASSOCIATED CABINETS
Redevelopment of research facilities with ancillary works, the application is accompanied by a Natura Impact Assessment
Retain and carry out alterations to an existing effluent treatment system
Retain a two storey double garage and a garden shed, and permission to install a tertiary effluent treatment system
To construct an extension to the side of the dwelling and to retain a utility garage to the rear of the dwelling. Gross floor space of proposed works: 38 sqm. Gross floor space of work to be retained: 56.6 sqm
The brief summarizes the pattern across all 43 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18682The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief