Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 303 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
RETAIN THE SUB-DIVISION OF THE EXISTING BUILDING INTO 4 SEPARATE UNITS FOR USE ON A COMMERCIAL BASIS ALONG WITH ALL ASSOCIATED SERVICES
Construction of an industrial workshop, administration offices, service yard, car park, and site road together with all ancillary site works and services.
CONSTRUCTION OF AN INDUSTRIAL WORKSHOP, ADMINISTRATION OFFICES, SERVICE YARD, CAR PARK, AND SITE ROAD TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
CHANGE OF USE OF EXISTING OPEN PLAN COMMERCIAL UNIT TO OFFICE UNIT FOR INTREO- FOR DELIVERY OF BRANCH OFFICE SERVICES TO MEMBERS OF THE PUBLIC TOGETHER WITH MATERIAL ALTERATIONS TO INTERIOR COMPRISING THE CREATION OF PUBLIC WAITING AREA/STAFF WORK AREA, OFFICES, MEETINGS ROOMS, STAFF/TOILET FACILITIES AND CIRCULATION SPACE AND ALL ANCILLARY SITE WORKS AND SERVICES AND SIGNAGE ON BUILDING EXTERIOR
Demolition of derelict buildings and the construction of a 1,412 sq m warehouse, incorporating offices, service yard, car park, and site entrance together with all ancillary site works and services
Planning Application for a Change of Use of the ground floor and part first floor of the existing Unit 7 premises from Retail to Community Social and Recreational Activities of a Religious Body and also Retention Permission for the existing front office unit at first floor level together with all associated site works, elevational changes, signage, and connection into existing services.
The brief summarizes the pattern across all 303 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18711The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief