Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 303 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN THE SUB-DIVISION OF THE EXISTING BUILDING INTO 4 SEPARATE UNITS FOR USE ON A COMMERCIAL BASIS ALONG WITH ALL ASSOCIATED SERVICES
Construction of an industrial workshop, administration offices, service yard, car park, and site road together with all ancillary site works and services.
CONSTRUCTION OF AN INDUSTRIAL WORKSHOP, ADMINISTRATION OFFICES, SERVICE YARD, CAR PARK, AND SITE ROAD TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
CHANGE OF USE OF EXISTING OPEN PLAN COMMERCIAL UNIT TO OFFICE UNIT FOR INTREO- FOR DELIVERY OF BRANCH OFFICE SERVICES TO MEMBERS OF THE PUBLIC TOGETHER WITH MATERIAL ALTERATIONS TO INTERIOR COMPRISING THE CREATION OF PUBLIC WAITING AREA/STAFF WORK AREA, OFFICES, MEETINGS ROOMS, STAFF/TOILET FACILITIES AND CIRCULATION SPACE AND ALL ANCILLARY SITE WORKS AND SERVICES AND SIGNAGE ON BUILDING EXTERIOR
Demolition of derelict buildings and the construction of a 1,412 sq m warehouse, incorporating offices, service yard, car park, and site entrance together with all ancillary site works and services
Planning Application for a Change of Use of the ground floor and part first floor of the existing Unit 7 premises from Retail to Community Social and Recreational Activities of a Religious Body and also Retention Permission for the existing front office unit at first floor level together with all associated site works, elevational changes, signage, and connection into existing services.
The brief summarizes the pattern across all 303 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18711The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief