Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development. The development will consist of permission for a period of 20 years for:- (a) lowering the floor of the existing permitted quarry from c155m to c143m AOD over the existing extraction area of 2ha.; (b) a 2.25ha extension to the permitted extraction area with a floor level of c143m AOD; (c) settlement lagoons; (d) construction of perimeter soil berm along northeast, west and southwest boundaries of the proposed extension area and perimeter fencing; (e) material testing portacabin; (f) all ancillary site development works and services; and retention permission for:- (g) 0.126ha storage area for topsoil/overburden at the south western corner of the existing quarry; (h) 1 no. portacabin (canteen/site office) 1 no. general storage container and 1 no. portaloo
To construct a dwelling house, detached garage, sewerage treatment system and percolation area, including all necessary site works
Of existing extension to the existing dwelling house, with additional bedrooms, living areas and kitchen area, including all necessary site works at
To retain (a) two dormer windows to the rear elevation of existing house (b) 1 no. detached garage, including all associated site works
For the erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with associated antennas and dishes and to remove the existing 15 metre lattice telecommunications structure with antennas (providing an overall height of 16.9 metres). The proposed development is all enclosed within an existing compound
To construct slatted cubicle shed with loose calving area and all associated site works at
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18779The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief