Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 103 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
EXTENSION OF DURATION of 18/802 - to construct a single-storey dwelling, entrance, driveway, treatment system, percolation area and all associated site development works
To construct a single-storey dwelling, entrance, driveway, treatment system, percolation area and all associated site development works
Construction of a single storey dwelling, domestic garage/stable building, new roadside entrance, new wastewater treatment system and all associated site works
For the construction of a single storey dwelling, domestic garage/stable building, new roadside entrance, new wastewater treatment system and all associated site works at
For the construction of a single storey front & side extension, front boundary wall amendments and the upgrading and relocation of the existing septic tank system along with the associated site works
To construct a single storey extension to rear (eastern side) of dwelling, install a new waste-water treatment system and raised percolation area, a new splayed entrance, to install a mobile home on site for a period of 18 months and all ancillary site works
The brief summarizes the pattern across all 103 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18802The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief