Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 68 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) RETAIN 1 NO. METAL CLAD STORAGE SHED (B) CONSTRUCT A SINGLE-STOREY EXTENSION COMPRISING 2 NO. BEDROOMS AND SHOWER ROOM AND (C) ALL ANCILLARY SITE WORKS & PLANNING PERMISSION TO (D) UPGRADE THE EXISTING SEPTIC TANK SYSTEM TO A MECHANICAL WASTEWATER TREATMENT SYSTEM FOLLOWED BY A POLISHING FILTER & DECOMISSION THE EXISTING SEPTIC TANK & (E) PERMISSION TO EXTEND THE PLANNING BOUNDARIES TO ACCOMODATE THE NEW WASTEWATER TREATMENT SYSTEM.
Permission for development to construct two dwelling houses with wastewater treatment units and sand polishing filters including all necessary site works
CARRY OUT ALTERATIONS/MODIFICATIONS FOR PERMISSION ALREADY GRANTED UNDER PLANNING REG 16/990. THE ALTERATIONS/MODIFICATIONS TO INCLUDE AN INCREASE IN FLOOR AREA, MODIFICATIONS TO ELEVATIONS, INTERNAL ALTERATIONS TO PROVIDE 3 NO. ADDITIONAL BEDROOMS (FROM 42 TO 45) AND EXTERNAL FIRE ESCAPE STAIRS
RETAIN DWELLING AS GRANTED UNDER (PL. REF 19-784) CURRENTLY UNDER CONSTRUCTION WITHIN REVISED BOUNDARIES
A SPLIT LEVEL ONE AND A HALF STOREY DOMESTIC DWELLING HOUSE, ACCESS DRIVE, AND TO INSTALL A WASTEWATER TREATMENT UNIT AND SAND POLISHING FILTER, ALONG WITH ALL ASSOCIATED EXTERNAL WORKS, SERVICING AND LANDSCAPING
CONSTRUCT A SPLIT LEVEL ONE AND A HALF STOREY DOMESTIC DWELLING HOUSE, ACCESS DRIVE AND TO INSTALL A WASTEWATER TREATMENT UNIT AND SAND POLISHING FILTER ALONG WITH ALL ASSOCIATED EXTERNAL WORKS, SERVICING AND LANDSCAPING
The brief summarizes the pattern across all 68 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18821The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief