Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 318 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The development consists of a total area of 36.5 Hectares comprising of the following: Deepening of 13.4 hectares which was previously subject to rock extraction down to 12mOD; Removal of overburden, construction of screening berms and extraction of rock down to 30mOD from a greenfield area consisting of 8.5 hectares; Continuation of use of 11.6 hectares consisting of processing infrastructure (crushing, screening & lime plant), offices, workshop, canteens and toilet facilities, weighbridges, wheelwash facilities, fuel storage area and switch room, settlement lagoons, entrance, haul roads, ESB sub-station and all other ancillary facilities; Continuation of use of existing pre-cast manufacturing facility and associated ancillary works for manufacturing of concrete products, batching of lime products and general storage of products and plant on an area of 3.0 hectares; Landscaping and restoration of the site and all associated ancillary facilities/works; The Applicant is seeking a 20 year permission as part of the planning application. The planning application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement.
For dwelling, entrance, wastewater treatment system, connection to mains water, soakpits and all other associated site works
Of planning permission P.03/1532
Of planning permission P.03/75
For the continued use of an existing asphalt plant and associated infrastructure and structures permitted under Planning Refs 99/1161 / ABP PL10.120270 and 04/129, within an application area of 1.7 hectares. The proposed development will not result in any increase in the permitted production capacity of the asphalt plant of 100,000 tonnes per annum at
For deforestation of part of my lands comprising of 1.69 hectares for conversion to agricultural land at
The brief summarizes the pattern across all 318 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18858The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief