Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 673 decisions within 5 km, 3 exact-site or onsite candidate records, and 32 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
32 structured nearby appeal records.
32 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT NEW DOMESTIC GARAGE, SIDE AND REAR BOUNDARY WALLS AND FOR ALL ASSOCIATED SITE WORKS
Construction of a two storey dwelling house including all other ancillary site works and connection to public services
Construction of 4 detached dwelling houses, connection to existing public services and for all associated site works
REMOVE PORTION OF EXISTING FRONT BOUNDARY WALL, ENLARGE FRONT ENTRANCE DRIVEWAY AND CONSTRUCT NEW PILLAR.
PERMISSION TO REMOVE PORTION OF EXISTING FRONT BOUNDARY WALL, ENLARGE FRONT ENTRANCE DRIVEWAY AND CONSTRUCT NEW PILLAR
Development will consist of 04 no. dwelling houses. Including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.
The brief summarizes the pattern across all 673 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18874The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief