Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 65 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extensions and alterations to existing house including all ancillary demolitions, siteworks and services
DEMOLITION OF EXISTING NON-HABITABLE COTTAGE AND CONSTRUCTION OF A DETACHED DWELLING HOUSE WITH STORAGE SHED, PROPRIETARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
EXTENSION AND ALTERATIONS TO EXISTING HOUSE COMPRISING; EXTENSION TO LIVING ROOM TO FRONT/SOUTH SIDE, ENTRANCE PORCH EXTENSION TO EAST SIDE AND ALL ANCILLARY SITEWORKS AND SERVICES
Construct an extension and alterations to existing dwelling house and for all ancillary site works and services
Demolition of existing farm structures, the restoration/reconstruction of the original single-storey cottage (64m2) and the construction of a new single-storey extension (171m2) to use as a single dwelling house, and associated site works, including site entrance, new wastewater treatment system and percolation area, and the reconstruction of the original boat shed (52m2)
RETAIN AND COMPLETE A PRIVATE DWELLING HOUSE CONSTRUCTED UNDER P06/3115
The brief summarizes the pattern across all 65 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18950The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief