2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 125 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house, a new vehicular entrance, a new domestic shed, installation of a treatment unit and percolation area, and all ancillary works
For development which will consist of the construction of a prefabricated unit for 1 No. classroom, to the front of the existing school, and all ancillary site works
For development consisting of the construction of a prefabricated unit for 1 No. classroom, to the front of the existing school and all ancillary site works
Consists of the construction of a two storey extension to the front and side of the existing school, to include 1 No. main-stream classroom, 2 No. additional needs classrooms and associated ancillary spaces, 6 No. additional car parking spaces and all ancillary site works
To construct a new dwelling house for partial use as a private residence and partial use as a bed and breakfast, new site entrance, private on-site wastewater treatment system, private garage and all other associated site works and ancillary services
To construct a new dwelling house for partial use as a private residence and partial use as a bed and breakfast, new site entrance, private on-site wastewater treatment system, private garage and all other associated site works and ancillary services
The brief summarizes the pattern across all 125 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18990The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief