Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 150 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1)construction of a hurling wall, fencing and lighting surrounding an all-weather playing surface; (2) retain and complete filling to the rear of playing pitch and re-alignment of the pitch; (3) construct a pedestrian walkway, new fencing and pedestrian lighting to the perimeter of re-aligned playing pitch; (4) construct an open spectator area and new dug-outs to re-aligned pitch and all associated works
The construction of a dwelling house, packaged wastewater treatment system, domestic garage, front entrance, and all associated services
Construction of calving pens, calf pens, feed passage, manure pit and concrete aprons
Construction of a single storey dwelling house, detached domestic garage, front boundary entrance walls, mechanical aeration unit with polishing filter system and all associated site works
Construction of a slatted cubicle house, calving pen, unroofed feed area, collecting/exit yard, slatted tanks, silage slab and concrete aprons
Construction of a new raised roof to create first floor development, external insulation with fenestration changes to all elevations, installation of a new septic tank and percolation area, raised pitched roof to garage to include storage area and all associated site works
The brief summarizes the pattern across all 150 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191066The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief