Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 104 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
An existing garage and all associated site works
Construction of dwelling house, domestic garage, widening of existing entrance, driveway, treatment unit and polishing filter and all associated site works
An existing dwelling house, entrance and driveway as-built and planning permission for the decommissioning of existing septic tank system, the installation of a new replacement wastewater system with percolation area, new red line site boundary and all ancillary site works
An existing single storey shed at the rear of the existing dwelling and all ancillary site works
The construction of a dwelling house with detached domestic garage, front boundary entrance walls, installation of a mechanical aeration unit and polishing filter with all associated site works
The (a) construction of single storey extensions to sides (east and west) and rear, (b) alterations to heads of windows to front elevation, (c) alteration to existing roof profile at west from hip to gable, (d) decommission of existing septic tank and installation of new on-site waste water treatment system and (e) all associated site works at site
The brief summarizes the pattern across all 104 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191199The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief