Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 51 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW UNDERGROUND PUMP SUMP TO INTERCEPT SOLIDS DISCHARGE AND DELIVER TO THE NEW ABOVE GROUND SOLIDS RESIDUALS TREATMENT TANKS; CONSTRUCTION OF NEW SOLIDS RESIDUALS MANAGEMENT SYSTEM (TO INCLUDE SETTLEMENT, BALANCE,THICKENING AND HOLDING TANKS); CONSTRUCTION OF A NEW SOLIDS DEWATERING BUILDING TO HOUSE A CENTRIFUGE TO PROVIDE SOLIDS THICKENING; INSTALLATION OF A KIOSK ENCLOSURE TO HOUSE THE ELECTRICAL CONTROL PANEL; AND ALL ANCILLARY SITE WORKS
DEMOLISH EXISTING FRONT AND REAR PORCHES, REMOVE DORMER WINDOWS TO FRONT AND REPLACE WITH ROOFLIGHT, CONSTRUCT SUN LOUNGE TO FRONT, CONSTRUCT NEW ENTRANCE PORCH TO SIDE AND CARRY OUT ALL ANCILLARY AND ASSOCIATED WORKS ON SITE
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND FILTER SYSTEM CONSTRUCTED ON SITE AND POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES
CONSTRUCT NEW DWELLING HOUSE, CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM WITH ALL ASSOCIATED WORKS, CONSTRUCT NEW DOMESTIC ENTRANCE OFF PUBLIC ROAD AND CARRY OUT ALL REQUIRED ANCILLARY WORKS ON SITE
CONSTRUCT NEW DWELLING HOUSE, CONSTRUCT DOMESTIC GARAGE, CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED WORKS, CONSTRUCT NEW DOMESTIC ENTRANCE OFF PUBLIC ROAD AND CARRY OUT ALL REQUIRED ANCILLARY WORKS ON SITE
The brief summarizes the pattern across all 51 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19125The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief