Sub-dividing a site, decommissioning and removing an existing effluent treatment system and connecting an existing house to public foul drain system, constructing a one and a half storey type dwelling with connection to public foul and drain system, and all associated ancillary site-works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Carrigeen , Clane , Co.Kildare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
19% of nearby decided applications were refused. The preview found 908 nearby planning records within 5 km where a location match is available.
- Matched source
- 191289
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Development on a 0.44 ha site approximately, known as Cois Abhainn. The development will consist of demolition of existing onsite buildings, including a vacant dwelling (old, disused farmhouse) and outbuilding; and the construction of a new residential apartment scheme (19 No. apartments in total), comprising 16 No. 2-bedroom units and 3 No. 3-bedroom units in 3 No. residential blocks ranging in height from 3 No. storeys (Block C) to 4 No. storeys (Blocks A and B) with upper floors setback from the northern elevation of the site, with recessed terraces/winter gardens to the rear (southern elevation) of the development: minor physical improvement works to existing vehicular entrance and pedestrian footpath; extension to existing bin store (located to the south); construction of 10 No. new car parking spaces (and reallocation of 9 No. car parking spaces from the adjacent residential development to the south to the proposed development) resulting in 19 No. car parking spaces in total for use by the new proposed development, and 50 No. cycle parking spaces (41 No. private secure spaces and 9 No. visitor spaces). The development will also consist of piped infrastructure and ducting; ancillary apartment storage; lift shafts and stair cores; hard and soft landscaping; changes in level; boundary treatments; drainage works; green roof systems; and all associated site development and excavation works above and below ground level
Demolition of existing onsite buildings, including a vacant dwelling (old, disused farmhouse) and outbuilding; and the construction of a new residential apartment scheme (16 no. apartments in total), comprising 4 no. one-bedroom units, 8 no. two-bedroom units and 4 no. three-bedroom units in two residential blocks reaching an overall height of 3 no. storeys, provision of private amenity space; minor physical improvement works to existing vehicular entrance and pedestrian footpath; extension to existing bin store (located to the south); construction of 16 no. new car parking spaces (and reallocation of 12 no. car parking spaces from the adjacent residential development to the south to the proposed development) resulting in 28 no. car parking spaces, in total, for use by the new proposed development; and 40 no. cycle parking spaces in a dedicated secure bike store. The development will also consist of piped infrastructure and ducting; hard and soft landscaping; public lighting; minor layout adjustments to existing internal road network; boundary treatments; drainage works; and all associated site development and excavation works above and below ground level. Revised by Significant Further Information which consists of 10no. apartments in total, comprising 5 no. one-bedroom units, and 5 no. two-bedroom units arranged in 5 no. two-storey blocks. In addition, a dedicated secure bin and bike storage building is now proposed to the east of the site, accommodating 20 no. cycle parking space is proposed. It is no longer proposed to extend the existing bin storage building within Cois Abhainn for use by the new residents, as was proposed in the original planning application submission. In line with the reduced number of units proposed in the revised design, the total number of car parking spaces proposed has been reduced from 28 no. spaces to 21 no. spaces on this 0.45 ha site, approximately, known as
Demolition of existing buildings on the site inclusive of a dwelling structure and shed and construction of a 29no unit apartment development in one three and four storey block, with recessed balconies, containing 7 no x1 bed units, 18 no x 2 bed units and 4 no x 3 bed units and amendments to existing residential site layout to provide an additional 51 no car parking spaces, enlargement of existing bin store and all associated landscaping and site development works. The site contains a Motte Monument which is a Protected Structure (RPS No. B14-68). The site also contains two Monuments (RMP No's KD014-026004 and KD014-026009) scheduled for inclusion on the Record of Monuments and Places.
A single storey side extension to the existing dwelling house and all associated site works,
Development will consist of attic conversion to two bedrooms with Velux rooflights on front and dormer window on rear, with shed/hobby room in rear garden
The brief summarizes the pattern across all 908 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 191289The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief