Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 656 decisions within 5 km, 3 exact-site or onsite candidate records, and 47 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
47 structured nearby appeal records.
47 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
CONSTRUCTION OF A MAINTENANCE DEPOT WITH WAREHOUSES, ON SITE CAR/TRUCK PARKING AREA, EFFLUENT TREATMENT SYSTEM AND REVISED SITE ENTRANCES AND ALL ASSOCIATED SITE WORKS AND SERVICES
FOR PL2/19/132 CONSTRUCTION OF A MAINTENANCE DEPOT WITH WAREHOUSES, ON SITE CAR/TRUCK PARKING AREA, EFFLUENT TREATMENT SYSTEM AND REVISED SITE ENTRANCES AND ALL ASSOCIATED SITE WORKS AND SERVICES
The development will consist of the erection of a new 2.4m high paladin yard gate and associated automation controls and fence to the yard area located at the end of the entrance avenue and all associated site works and services.
(A) A NEW TWO-STOREY ADMINISTRATION OFFICE BUILDING. (B) A NEW SINGLE-STOREY WAREHOUSE STORAGE BUILDING WITH ANCILLARY CANTEEN, TOILETS & ADMINISTRATION OFFICE ACCOMMODATION. (C) NEW ESB SUB-STATION AND SWITCH ROOM. (D) ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT INCLUDING THE FOUL WATER PUMP SYSTEM AND RISING MAIN WITH CONNECTION TO FOUL DRAIN APPROVED UNDER REGISTER REFERENCE 20/435, SURFACE WATER DRAINAGE & ATTENUATION, WATERMAINS, INTERNAL SITE ROADS & FOOTPATHS, BICYCLE SHELTER AND NEW ACCESS ROAD OFF THE L2025
USE OF PART OF SHOP AS OFF LICENCE
THE CONSTRUCTION OF A GRAVITY SEWER LINE AND WASTEWATER PUMPING STATION AT CAPPINCUR INDUSTRIAL ESTATE AND A RISING MAIN TO CONNECT TO THE EXISTING PUBLIC SEWER AT DAINGEAN ROAD, TULLAMORE
The brief summarizes the pattern across all 656 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19132The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief