Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 146 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Longford County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Longford County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Longford County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Longford County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) proposed construction on 7 no. single storey two bedroom dwellings in two house types B) provision of access from existing service roadway C) green open space, boundary fences/walls internal access road, D) connection to existing public services with sewer and water supply and all associated ancillary site works.
A) proposed construction of 20 no. dwellings consisting of 4 no. single storey two bedroom dwellings & 16 no. two storey three bedroom dwellings b)proposed primary healthcare building (1405m.sq) c) provision of new access from public roadway d) associated carparking, green open space, boundary fences/walls internal access road e) connection to existing public services with sewerage and water supply and all associated ancillary site works
The retention of the existing habitable attic space to include velux windows as currently constructed servicing the existing two storey type dwelling house which was granted full planning permission under planning reference number PL07/568. Full planning permission is also being sought for the alteration of existing velux windows servicing the existing habitable attic space so as to ensure fire compliance
Of existing building on revised site boundaries
Amendments to planning reference number 2360219 to now include demolition of existing outbuilding and construction of 2 no. blocks of self-contained tourist/short term let accommodation each block containing four no. 1 bedroom units with kitchen, bedroom, WC & living space. The site will provide upgrade of access, bicycle parking, garden/amenity wellness area, connection to public services, all to the rear of existing guest house and all ancillary site works
Proposed demolition of existing outbuilding and construction of single storey extension to the rear of existing guest house, changes to relevant elevations and all ancillary site works
The brief summarizes the pattern across all 146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19140The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief