Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 240 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For conversion of derelict cottage to habitable accommodation and all associated site works
Of Planning Reference P13/275
To build a dwelling, domestic garage, construct entrance, bore well, install septic tank including associated site works at
Of Planning Permission for Existing Mobile Home and associated site works adjacent to my dwelling house
For the construction of an entrance to my lands for use by forestry and all associated site works at
For the proposed development to consist of temporary road widening works and construction of temporary sections of stoned roads and all ancillary works on the R691 and R695 at bends and junctions to enable the delivery of turbine components. These works consist of; • Temporary widening of section of the R691 in the townland of Booly comprising construction of a stoned area to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 and R695 in the townland of Ballyclovan to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 in the townland of Scotsborough to accommodate abnormal load deliveries. The works at this location will include construction of a temporary bridge crossing and all associated drainage and sediment protection, a temporary crane hardstand, temporary welfare facilities and carparking, temporary refuelling area, temporary bridge assembly area and temporary stockpiles. Advisory Note: There are also works required in County Tipperary, and a separate amendment planning application will be made for these to Tipperary County Council. The planning application will be accompanied by a Natura Impact Statement.
The brief summarizes the pattern across all 240 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19144The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief