Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 339 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for the development of the infilling of lands and raising of ground levels using imported inert material consisting of natural excavated sub-soil and stones, and builders rubble to a depth of approximately 3 meters over an area of 0.705Ha and all associated site works. The land will be infilled with imported inert material not exceeding 25,000 tonnes via two new entrances including top soil and seeding on completion. The felling of trees will be carried out prior to infilling. This development will require a Certificate of Registration in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007, as amended
Permission to erect a two-storey dwelling with attached sunroom, treatment plant, percolation area, new entrance and all associated site works
Permission to erect a two storey dwelling with attached sunroom, treatment plant, percolation area, new entrance and all associated site works
Permission for development consisting of erection of a new storey and a half type dwelling, the installation of a proprietary waste water treatment unit, percolation area, new site entrance and ancillary site works
Planning permission for a new two storey detached dwelling, installation of new wastewater treatment system, new entrance, new gates & piers together with all ancillary and associated site works
Permission for a two-storey dwelling, single-storey detached domestic garage, new entrance with gates & piers, new wastewater treatment system and all associated site works.
The brief summarizes the pattern across all 339 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19301The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief