Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 103 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct new storage shed and all associated site works
To construct dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works.
Develop as follows: the continued use and operation of the existing quarry including deepening of the quarry. Extraction will be confined to the existing permitted quarry area (P.A. Ref. 10/383) comprising an extraction area of c. 14.5 ha within an overall application area of c. 19.6 ha. The development will include provision of new site infrastructure, including portacabin site office / canteen, toilets, concrete batching plant and truck washdown facility, hydrocarbon interceptors, mobile crushing and screening plant, upgrading of the water management system, provision of holding tank for wastewater, and other ancillaries. The proposed development will utilise/upgrade the existing in-situ quarry infrastructure, including site access, internal roads, store room, wheel wash, weighbridge, aggregate storage bays, refuelling hard stand, water settlement pond system, and other ancillaries. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
Construct slatted shed with loose area and all associated site works
Construct storage shed and all associated site works
Construct new dwelling house and garage, new treatment system with polishing filter, new site entrance and all associated site works
The brief summarizes the pattern across all 103 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19678The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief