Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,554 decisions within 5 km, 3 exact-site or onsite candidate records, and 118 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
118 structured nearby appeal records.
118 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention & Permission: 1. Retention of an existing residential modular unit and all associated site development works. 2. Permission for a waste water treatment system. *Significant Further Information submitted 26/8/20*
Permission for development will consist of a dwelling house, domestic garage, waste water treatment system and associated site development works.
Permission for the construction of a new dwelling house, new wastewater treatment system and percolation area and all associated site works.
Permission for the demolition of an existing dwelling house. Construction of a dwelling house, waste water treatment system and associated site development works *Significant further information received 05/8/20*
Permission for development at Haynestown, Dundalk, County Louth. The development works will consist of; the importation of subsoil to raise and level existing ground for improvement of existing ground, use of existing entrance and all associated site works.
Part 8: Louth County Council, Infrastructure Section hereby gives notice of its intention to carry out construction of a Park and Share Scheme at Gibstown, approximately 250m west of Junction 16 of the M1 Motorway in County Louth. The proposed works shall comprise, generally, the following: An off-road 'Park & Share' car park facility at Gibstown near Junction 16 M1 Motorway; A right turn lane on the public road to support safe access to the facility from Junction 16 M1 Motorway; A safe pick-up and drop-off area for those using the facility; Improved public lighting provision between Junction 16 M1 Motorway and the new Park and Share facility and lighting of the facility; Provision for possible future security measures (e.g. CCTV), electric vehicle (EV) charging points and public transport connection; Measures to deter use by heavy goods vehicles. All associated site development works
The brief summarizes the pattern across all 1,554 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19697The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief